|
Roller Tables:
36 Roller Centers:
10 Sections with 4 Rollers and on 36 Centers
15 Sections with 6 Rollers and on 36 Centers
26 Roller Centers:
5 Sections with 3 Rollers and on 26 Centers
10 Sections with 5 Rollers and on 26 Centers
15 Sections with 7 Rollers an don 26 Centers
Powered Rollers:
Non-Lifting Powered Rollers
Friction
Drive Rollers for Discharge Side Do Not Lift
Powered Lift Rollers:
Independent unit mounts to roller column
Cross Transfer Truck System:
System has
squaring rollers, 10 of storage area. Truck will lift
and move. Welding and Mounting to the tables is included.
Drive System for Transfer Trucks. One is required for the
Input
Side and one is
required for the Output Side.
Special Material Handling:
4 Lift Up Roller Section (Drawbridge Style) Powered
rollers
on 12 centers.
Clutch
powered. Raises 90 degrees.
Roller Disengagement System for 4 Lift Up Roller Section.
Used for Automatic Systems.
4 Powered Roller Section. Rollers on 12 Centers. Section
does
not lift.
Roller Disengagement System for Non-Lifting 4 Powered
Roller
Section. Used for Automatic Systems.
Coolant Recovery System:
System includes 55-gallon reservoir, pumps, hoses, fittings,
screens, flow valves, level sensors, and other items for
re-routing coolant to saw.
Installation:
Cost for Material Handling Installation at customers
facility
will be charged as an hourly rate per technician. A typical
installation can vary from 3 to 5 days. Other factors such as
floor condition,
utility availability, and customers assistance
will affect these estimated times.
|